LAND Germany site plan of the noise barrier in Duisburg Wedau

Noise Barrier Duisburg Wedau

Germany

Against the backdrop of a 2 km long noise barrier being built within the wider Duisburg area, the urban development gap between Neudorf, Bissingheim and Wedau is being closed on the former marshalling yard in Duisburg Wedau on an area of over 90 hectares. Thus, the Sechs-Seen-Platte recreational area and the Wedau sports forest will be connected and generate a wide range of leisure activities for residents and new residents of the future neighbourhoods.

Against the backdrop of a 2 km long noise barrier being built within the wider Duisburg area, the urban development gap between Neudorf, Bissingheim and Wedau is being closed on the former marshalling yard in Duisburg Wedau on an area of over 90 hectares. Thus, the Sechs-Seen-Platte recreational area and the Wedau sports forest will be connected and generate a wide range of leisure activities for residents and new residents of the future neighbourhoods.

The backdrop for this step in Duisburg’s urban development is a flourishing 8-metre-high green infrastructure. In the context of the new development area of Duisburg Wedau, a wall is being built between the new development area and the railway tracks to protect against noise emissions. With a length of almost two kilometres, this noise protection facility has the potential to create an unmistakable address, ecological networking and a new identity.

Indeed, many plant species can be found in both sides of the wall. The natural colour changes of the shrubs, perennials and grasses over the course of the seasons form the common denominator of the tracks and organic nature.

In order to overcome the barrier of the railway tracks, a new bridge will be provided to allow mobility from one side to another: a pedestrian pathway is then being designed to climb the green hills surrounding the wall, and a pathway is open in between the noise protection wall. The pathway consists of a series of ramps and pedestals, surrounded by greenery and supported almost entirely by a compressed earth “Terramesh” system. The surrounding topography then results in a series of green steps that accompany the climbing to the top along the ramp to be later merged to the incoming hills on both sides of the plot. The pathway is not only barrier-free but was specifically designed to allow access also to bike riders being equipped with appropriate handrails and falling protections.

Furthermore, the ramp is conceptualized as a panoramic pathway. For those seeking a quicker ascent, an alternative route comprised of open staircases housed within a steel tower is provided. This tower connects to the pathway at three different levels and offers panoramic viewpoints on multiple tiers. Of particular interest is the rooftop of the tower, which promises expansive vistas of the entire wall and its surroundings.

The noise protection wall is currently under construction. If you are curious to follow the process, have a look at the 360° aerial footage from GEBAG Duisburg that is regularly being updated here.

Related projects

Solar Panels on a mountain with blue sky and some clouds

Duragno Alpine Solar Park

Duragno Alpine Solar Park

Volvo Electric Charging Station, Milan

Volvo Electric Charging Station, Milan

Green Connect, Vilnius

Green Connect, Vilnius

Water Park, Arcore

Water Park, Arcore

Al-Khuwair Downtown Masterplan, Muscat

Al-Khuwair Downtown Masterplan, Muscat

La Promenade Fleuve, Québec

La Promenade Fleuve, Québec

Al Urubah Park, Riyadh

Al Urubah Park, Riyadh

Airolo Valley Renaturation, Airolo

Airolo Valley Renaturation, Airolo